Levi Heywood Public Library

The public library system of Gardner, Massachusetts was established in 1841 and continues a rich and proud tradition of service to its community. The new library was built on a vacant site in a historic industrial area as a key element in the revitalization of downtown Gardner.

The public library system of Gardner, Massachusetts was established in 1841 and continues a rich and proud tradition of service to its community. The new library was built on a vacant site in a historic industrial area as a key element in the revitalization of downtown Gardner.

On the interior, Adult Services occupies both levels on the north side, with browsing and popular collections on the lower levels and Reference on the upper level linked by a atrium and open stair. The Children’s Room is on the upper level off the Pine Street entrance, and the meeting room is off the main entrance on the lower level. The tower element highlights the main entrance and the Historic Room on the upper level.

(Frank Adams was Project Architect for Burt Hill with Richard Smith as project designer)

Project Type
Library

Location
Gardner, MA

Area
32,160 sf

Cost
$5,851,100

Completion
2004